Dr. Kim Duk Whang Founder ESWS

Dr. Kim Duk Whang Founder ESWS
This years Mother Mission Dedicated to the Memory of Dr.Kim who passed away May 2011

Thursday, October 13, 2011

Down in 3rd tunnel

This is a reinactment of how the 3rd tunnel was built. The yellow circles are where they put the dynamite. Tunnel is 1635 metres long and 2 metres wide and in some places 2 metres high but we had to wear hard hats due to the low roof in most places.
At the end of the tunnel it was only 300 metres to North Korea.
Sorry no photo's as cameras are not allowed.

1 comment:

  1. Hard Rock Mining you would have to wonder how the explosive blast noise was concealed

    The Cruze Bros

    ReplyDelete